Approved electrical contractors will be performing a planned maintenance on the feeds serving our Data Centres UK-DC26B and US-DC11F
Details of the planned maintenance are as follows :
----------
Start: 30/11/26 @ 08:00 GMT
Latest Finish: 30/11/26 @ 17:00 GMT
Details: Electrical engineers will be performing works to connect new solar panels to our power supply. Engineers will endeavour to minimise any risk to power, however, due to the nature and location of the works we are notifying customers that there is still a very small element of risk of the feed potentially being impacted. Downtime should not exceed 30 mns
Affected: Customers located within UK-DC26B and US-DC11F
Impact: Due to the nature of the works the feed being worked on should be considered at risk for the duration of the working window
----------
Wednesday, October 28, 2026