As part of our preventative maintenance measures, a routine impedance test is required on the battery stack in order to test overall battery health and ensure future performance and capacity; therefore our engineers will be performing battery tests on our power feeds.
During this 2-leg maintenance, the UPS will need to be taken offline in order to test the batteries meaning any customers that solely use this feed will be at risk from a possible mains failure.
---- LEG 1 -----
During this 2-leg maintenance, the UPS will need to be taken offline in order to test the batteries meaning any customers that solely use this feed will be at risk from a possible mains failure.
---- LEG 1 -----
- At Risk Window Start: 21/02/2018 - 09:15 GMT
- At Risk Window End: 21/02/2018 – 16:45 GMT
---- LEG 2 -----
- At Risk Window Start: 22/02/2018 - 09:15 GMT
- At Risk Window End: 22/02/2018 – 16:45 GMT